
- Collections
Omniprobe lift-out grids
Custom copper or molybdenum lift-out grids are specifically designed for in-situ lift-out. These grids include multiple indexed mounting locations with both vertical bars and "V" shaped attachment surfaces. 3mm diameter.
Omniprobe TEM Grid Comparison Chart
Product | Posts | Material | Nominal Thickness (µm) |
Nominal Post Downset (µm) |
Unique Feature |
EMS75964-01 | 3 | Copper | 30 | 10 | — |
EMS75964-02 | 3 | Molybdenum | 30 | 10 | Top Downset Only |
EMS75964-03 | 0 | Berylium | 25 | N/A | Half Ring |
EMS75964-04 | 5 | Copper | 40 | 10 | 5th Post is "E" |
EMS75964-05 | 4 | Copper | 30 | 10 | — |
EMS75964-06 | 4 | Molybdenum | 30 | 10 | Top DS Only |
EMS75964-07 | 3 | Copper | 30 | 5 | Side Access |
EMS75964-08 | 3 | Copper | 30 | 5 | — |
EMS75964-09 | 5 | Copper | 35 | 5 | 5th Post is "E" |
EMS75964-10 | 4 | Copper | 30 | 5 | — |
Code | Material | Type | Pack Size | Availability | Price | Updated: 02-04-2025 |
---|---|---|---|---|---|---|
EMS75964-01 | Copper | 3 post, 10um downset | Pack/100 | 0 in stock (?) | $454.00 AUD | |
EMS75964-02 | Molybdenum | 3 post, 10um downset | Pack/25 | 0 in stock (?) | $671.00 AUD | |
EMS75964-03 | Beryllium | 0 post, half ring | Each | 0 in stock (?) | $958.00 AUD | |
EMS75964-04 | Copper | 5 post, 10um downset | Pack/100 | 0 in stock (?) | $492.00 AUD | |
EMS75964-05 | Copper | 4 post, 10um downset | Pack/100 | 0 in stock (?) | $454.00 AUD | |
EMS75964-06 | Molybdenum | 4 post, 10um downset | Pack/25 | 0 in stock (?) | $671.00 AUD | |
EMS75964-07 | Copper | 3 post, side access | Pack/100 | 0 in stock (?) | $271.00 AUD | |
EMS75964-08 | Copper | 3 post, 5um downset | Pack/100 | 0 in stock (?) | $271.00 AUD | |
EMS75964-09 | Copper | 5 post, 5um downset | Pack/100 | 0 in stock (?) | $284.00 AUD | |
EMS75964-10 | Copper | 4 post, 5um downset | Pack/100 | 0 in stock (?) | $284.00 AUD |
* Ordering Schedule
This item is available for back-order where 0 stock is listed.
We order from this manufacturer weekly, with an estimated lead time of 4 weeks.
This is the estimated lead time, based on the average time taken previously to fill orders from this particular supplier.
Lead times are from when we receive your order until when we fill your order. For delivery times, please see shipping information below.