Veco handle grids, square mesh

Veco Grids offer superior handling characteristics with a wide variety of styles available. Veco Grids are the most rigid grids available.3.05mm diameter, 20.3µm thicknessMaterial: Copper (Cu); Nickel (Ni)Available:

Veco Grids offer superior handling characteristics with a wide variety of styles available. Veco Grids are the most rigid grids available.

3.05mm diameter, 20.3µm thickness
Material: Copper (Cu); Nickel (Ni)

Available:

Type Material Pitch
(µm)
Hole
(µm)
Bar
(µm)
100 mesh Cu, Ni 250 200 50
150 mesh Cu, Ni
167 117 50
200 mesh Cu, Ni
125 85 40
300 mesh Cu, Ni
83 45 38
400 mesh Cu, Ni
63 30 33
111HDspec Cu, Ni
- 190 -
100HDspec Cu, Ni
- 200 -

Guide to TEM Grids, Handling and Preparation

Updated: 16-03-2026
Code Material Mesh Size Pack Size Availability Price Updated: 16-03-2026
EMSHD100-CU Copper 100 mesh Pack/100 No ETA $52.00 AUD
EMSHD100-NI Nickel 100 mesh Pack/100 No ETA $52.00 AUD
EMSHD150-CU Copper 150 mesh Pack/100 No ETA $52.00 AUD
EMSHD150-NI Nickel 150 mesh Pack/100 No ETA $52.00 AUD
EMSHD200-CU Copper 200 mesh Pack/100 No ETA $52.00 AUD
EMSHD200-NI Nickel 200 mesh Pack/100 No ETA $52.00 AUD
EMSHD300-CU Copper 300 mesh Pack/100 No ETA $52.00 AUD
EMSHD300-NI Nickel 300 mesh Pack/100 No ETA $58.00 AUD
EMSHD400-CU Copper 400 mesh Pack/100 No ETA $56.00 AUD
EMSHD400-NI Nickel 400 mesh Pack/100 No ETA $58.00 AUD
EMSHD111S-CU Copper 111HDspec Pack/100 No ETA $52.00 AUD
EMSHD111S-NI Nickel 111HDspec Pack/100 No ETA $52.00 AUD
EMSHD100S-CU Copper 100HDspec Pack/100 No ETA $52.00 AUD
EMSHD100S-NI Nickel 100HDspec Pack/100 No ETA $52.00 AUD

* Availability Explanation

X weeks – the estimated lead time, based on the average time taken previously to fill orders from this particular supplier. Lead times are from when we receive your order until when we fill your order. For delivery times, please see shipping information below.

In Stock – Plenty of stock on the shelf, ready to ship.

No ETA – our supplier has advised they cannot provide an accurate ETA. Generally there is some issue with supply, and it may be more than 6 months.