LYNX process accelerator (LPA)
One on the most time consuming tasks during Paraffin processing is wax infiltration. Not a step to cut corners on unless you want to deal with poorly infiltrated blocks. The Lynx-LPA was designed to allow a greater through-put of specimens without compromising the critical infiltration step. Once your initial tissues reach the first paraffin step you can transfer the cassette holder to the Lynx-Pal for vacuum infiltration while you un-burden the Lynx to start another process cycle.
The LPA has 3 positions to accept three HP cassette holder which conveniently uses the same Aluminium vial as the Lynx processor to contain paraffin. Each Aluminium vial is fitted with a platform to allow the stir-bar to circulate the melted wax.
Processing time can be set between 1 and 180 minutes in variable increments. Temperature can be set between 40 and 65°C in one degree C increments. Temperature is displayed in Deg C as a two digit number without any decimal point. The temperature accuracy at the sensor (and on the display) will be within ±2°C. Vacuum off time can be between 0 and 3 minutes in 1 minute increments. Vacuum cycle runs as on time followed by the off time where 0 on time implies that no vacuum is necessary and 0 off time implies that vacuum must be on continuously. During sample processing the vacuum is applied as per on and off time selection. If the processing is paused, the vacuum is released within 15 seconds. At the end of the cycle time, the vacuum continues to be cycled and temperature is held at the desired point.
Specifications
Number of Paraffin Containers: | 3 |
Temperature Range: | 37°C - 75°C |
Vacuum On Time: | 0:30 To 3:00 (Min:Sec) in 30 second increments |
Vacuum Off Time: | 0:15 to 2:00 (min:sec) in 15 Second increments |
Vacuum: | Preset at factory, 5PSI (±2) below ambient |
Temperature Accuracy: | ±2°C at the sensor at set point |
Temperature Offset: | -5 to +5°C |
Process Time: | 0:15 To 3:00 (hour:Min) in 15 minute increments |
Stirring: | Magnetic Stir Bar |
Input Voltage: | 100-230V AC 50/60Hz |
Power: | 150W Max |
* Ordering Schedule
This item is available for back-order where 0 stock is listed.
We order from this manufacturer weekly, with an estimated lead time of 4 weeks.
This is the estimated lead time, based on the average time taken previously to fill orders from this particular supplier.
Lead times are from when we receive your order until when we fill your order. For delivery times, please see shipping information below.